A second Monday in a row in which I failed. Maybe I should call every day I lift "Friday".
Squat: 70 x 5 (pause); 160 x 3; 190 x 1; 205 x 3; 177.5 x 5
Press: 45 x 5; 65 x 3; 85 x 1; 97.5 x 1 (failed was supposed to be x 3); 75 x 5 x 2
Dead: 135 x 3; 225 x 2; 315 x 0 ; 267.5 x 3