
Originally Posted by
UTG2812
So when I opened the thread 2 months ago I did NLP. I then increased the rest days, doing '1 day on - 2 days off' as described in PP.
Two weeks ago I switched to a 4-day-split to further reduce the volume of the squat.
A:
Bench 5RM
Press 5x5 @ 90% of 5RM
B:
Deadlift 5RM
Squat 5x5 @ 90% of 5RM
C:
Press 5RM
Bench 5x5 @ 90% of 5RM
D:
Squat 5RM
Power Clean 5x3
I am training every other day. Not doing any assistance except for Chins on day A.
I will probably even go from 5x5 to 5x4 and see if I can still make progress with one set less.
Numbers:
Deadlift: 340 lbs, Squat: 315 lbs, Bench: 203 lbs, Press: 153 lbs, Clean: 168 lbs