starting strength gym
Page 1 of 3 123 LastLast
Results 1 to 10 of 23

Thread: Starting Strength San Antonio

  1. #1
    Brent Carter's Avatar
    Brent Carter is offline Owner, Starting Strength Dallas
    Starting Strength Coach
    Join Date
    Nov 2011
    Location
    Dallas, TX
    Posts
    544

    Default Starting Strength San Antonio

    • starting strength seminar december 2024
    • starting strength seminar february 2025
    • starting strength seminar april 2025
    Here it is our first official post: Starting Strength San Antonio

    If you are already on our mailing list this will not really be news to you but we have signed a lease and are engaged with a general contractor. Our buildout will begin on Aug 2nd. Our official address is:

    19739 IH-10 West, Suite 102,San Antonio, TX 78256

    Pre-sales will be announced VERY soon so stay tuned!

    Here is a sneak peak of our floor layout:


  2. #2
    J.D. Shipley's Avatar
    J.D. Shipley is offline Owner, Starting Strength Houston
    Join Date
    Nov 2016
    Location
    Houston, TX
    Posts
    125

    Default

    Looks great! Target open date?

  3. #3
    Brent Carter's Avatar
    Brent Carter is offline Owner, Starting Strength Dallas
    Starting Strength Coach
    Join Date
    Nov 2011
    Location
    Dallas, TX
    Posts
    544

    Default

    Taget open date is unofficially October 25th. Once we get a construction permit we can tighten that date down and launch pre-sales.

    We started some demo work this past week and have ordered all of our long lead time things. But this is a COMPLETELY empty shell to start. It's a first gen building so we will be the very first tenants. That means we are responsible for literally everything: electricity wiring, AC unit, hell even the walls we have to put up ourselves. Luckily our architects have been hard at work behind the scenes for months now (or at least what feels like months).

  4. #4
    Brent Carter's Avatar
    Brent Carter is offline Owner, Starting Strength Dallas
    Starting Strength Coach
    Join Date
    Nov 2011
    Location
    Dallas, TX
    Posts
    544

    Default

    As usual still waiting on the beurocratic process to complete. Our GC has done all they can until the construction permits get released. They are waiting to close up the walls they framed and fill in the concrete trench they dug for the plumbing presently.

    Once we get that little piece of paper that says we can move on we will announce the pre-sale going live. This is where you can both lock in the time you want to train AND lock in a discounted membership INDEFINITELY (while your membership remains active).

    Stay tuned!

  5. #5
    Brent Carter's Avatar
    Brent Carter is offline Owner, Starting Strength Dallas
    Starting Strength Coach
    Join Date
    Nov 2011
    Location
    Dallas, TX
    Posts
    544

    Default

    Alright alright! We finally got the City of San Antonio to release the construction permit. I'll be following up with the GC to nail down that completion date but it looks like there are no further major hurdles to getting this project done.


    I have had a number of conversations with our future gym members over the last week and a half and very much enjoy connecting with you guys. San Antonio here we come!

  6. #6
    Brent Carter's Avatar
    Brent Carter is offline Owner, Starting Strength Dallas
    Starting Strength Coach
    Join Date
    Nov 2011
    Location
    Dallas, TX
    Posts
    544

    Default

    Here we go!!!! The gym will be open for intros starting on the 20th of November and full swing with group sessions starting on the 29th.

    Pre-sales are now live. So don't miss your chance to snag a discounted rate at the gym and your first pick of training time slots. We had 4 sign ups within the first 10min of going live.


    PRICING - Starting Strength Gym in San Antonio, TX | Get Strong – Guaranteed



  7. #7
    Brent Carter's Avatar
    Brent Carter is offline Owner, Starting Strength Dallas
    Starting Strength Coach
    Join Date
    Nov 2011
    Location
    Dallas, TX
    Posts
    544

    Default

    Another exciting development. The temporary signage is now up! Progress keeps chugging along with the buildout.



  8. #8
    Brent Carter's Avatar
    Brent Carter is offline Owner, Starting Strength Dallas
    Starting Strength Coach
    Join Date
    Nov 2011
    Location
    Dallas, TX
    Posts
    544

    Default

    Things are really coming along inside. They have the walls put up and the doors on the hinges.




  9. #9
    Brent Carter's Avatar
    Brent Carter is offline Owner, Starting Strength Dallas
    Starting Strength Coach
    Join Date
    Nov 2011
    Location
    Dallas, TX
    Posts
    544

    Default

    This is the portion of the buildout where things finally start to get exciting. The rolled rubber floor is now down and the platform construction will begin on Tuesday. We had to push it back a couple days so that we could float and level the entire training floor. Having a perfectly flat and level floor is absolutely critical to building a gym.

    Our Head Coach, Victoria Diaz, also put out a video this past week on the deadlift. Check it out:
    <em>


  10. #10
    Join Date
    Jan 2018
    Location
    San Antonio, TX
    Posts
    3

    Default

    starting strength coach development program
    For more insight into the gym and my journey to becoming the Head Coach at Starting Strength San Antonio check our interview from Voyagesanantonio.com

Page 1 of 3 123 LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •