starting strength gym
Results 1 to 2 of 2

Thread: Slingshot bench integration

  1. #1
    Join Date
    Sep 2016
    Location
    Kansas City, MO
    Posts
    115

    Default Slingshot bench integration

    • starting strength seminar october 2024
    • starting strength seminar december 2024
    • starting strength seminar february 2025
    How do most of you intermediates integrate the slingshot into your benching program?

    I'm doing Hepburn B so a 2-3 rep progression scheme and I'd like to add in some type of slingshot work because it seems like it would be an aid to get ready for the heavier weights. I was thinking of doing the rep progression Mon/Fri and on Wednesday mixing in some slingshot, floor press, and/or pause bench. I just was wondering how often to add slingshot and how much additional weight to use with it? I have the red slingshot...brand new, never used. It looks cool hanging on the wall though.

  2. #2
    Join Date
    Nov 2015
    Posts
    230

    Default

    The red is about 15%, but you don't need to add weight necessarily. You could just finish with higher rep work with a weight you can normally only for say 6-8 reps. You could add weight and do slow eccentrics, this will build some muscle as well as teach you control of a heavier weight.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •